INSP-Final Inspection | 10/9/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Troy Cobbley
|
|
|
IT room sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PASS |
Troy Cobbley
|
|
|
Piping above the gridded ceilings is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the hardlids can be installed to cover piping.
|
Intake Approval | | | 8/27/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/27/2015 | | 8/27/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/27/2015 | | 8/27/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/27/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/27/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/27/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/27/2015 | | 8/27/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 8/26/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 26 2015 12:25PM
|