INSP-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | CANC |
Troy Cobbley
|
|
|
Sprinkler contractor did not arrive for inspection. No inspection was performed.
|
INSP-Final Inspection | 9/8/2015 | 9/9/2015 | 9/9/2015 | A | FAIL |
Troy Cobbley
|
|
|
No testing done since power has not been ran to the fire alarm equipment
|
Plan assigned to (Lee) | 9/8/2015 | | 9/8/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/8/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 9/8/2015 | | 9/8/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/8/2015 | | DONE |
|
|
|
plans approved with review comments.
|
Permit Ready to Issue | | | 9/8/2015 | | DONE |
|
|
|
all requirment met
|
Issue and Print Permit | | | 9/8/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/8/2015 | | 9/8/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 8/31/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 31 2015 3:55PM
|