INSP-Final Inspection | 7/20/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 7/1/2016 | 7/6/2016 | 7/6/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversatio with point of contact, Jame phone# ###-####, inspection will be rescheduled for a later date.
|
INSP-Sprinkler Rough-in | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PASS |
Jim Page
|
|
|
Overhead fire sprinkler tenting/rough to cover inspection passed/complete, all overhead fire sprinkler piping approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PASS |
Jim Page
|
|
|
2 hour hydrostatic test @ 200 psi passed/complete.
|
Sprinkler Plan Check | 10/22/2015 | | 10/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/22/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/22/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/22/2015 | | 10/22/2015 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 9/14/2015 | | 9/14/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/14/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 9/11/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/11/2015 | | 9/11/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/8/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 8 2015 9:53AM
|