INSP-Final Inspection | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed again.
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | FAIL |
Troy Cobbley
|
|
|
Above ground hydro test failed due to visible loss on guage.
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2015 | 10/5/2015 | 10/5/2015 | P | CANC |
Troy Cobbley
|
|
|
Contact - Matt Robison - ###-#### Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 9/30/2015 | 10/1/2015 | 10/1/2015 | P | CANC |
Troy Cobbley
|
|
|
No water on site. No hydro performed.
|
INSP-Supply line flush | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | CANC |
Troy Cobbley
|
|
|
No water on site. No flush performed.
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2015 | 9/29/2015 | 9/29/2015 | P | CANC |
Troy Cobbley
|
|
|
United water has not provided water to site yet.
|
INSP-Supply line flush | 9/28/2015 | 9/28/2015 | 9/29/2015 | P | CANC |
Troy Cobbley
|
|
|
United water has not provided water to site yet.
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in and tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 9/23/2015 | 9/24/2015 | 9/24/2015 | P | CANC |
Troy Cobbley
|
|
|
Matt is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Permit Ready to Issue | | | 9/17/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/17/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/17/2015 | | 9/17/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/14/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/14/2015 | | 9/14/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/14/2015 | | 9/14/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/14/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 10 2015 9:28AM
|