INSP-Final Inspection | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Gas was not connected so I was unable to verify the 200 degree shut down per the IFC chapter 24 interlock requirements.
|
Application received | | | 9/14/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 9/14/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/14/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/14/2015 | | 9/14/2015 | | DONE |
Kristal Soland
|
|
|
|