Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00649
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 9501 W FAIRVIEW AVE
Project NameDENNIS DILLON 2ND FLOOR TI
Customer Number 
ePlanReviewYes
Description
[Dennis DIllion 2nd Floor TI] - Quick Permit
TVFP WILL RELOCATE 2 HEADS AND ADD 3 HEADS IN THE AREA OF WORK. EXISTING LINES AND MAINS WILL STAY IN PLACE. THE NEW HEAD LAYOUT IS TO ACCOMMODATE THE REMODEL AND COMPLY WITH NFPA 13 STANDARDS. EXISTING EQ BRACING AND HANGERS WILL STAY IN PLACE.

(Dennis Dillon Auto Parts Office Renovation) Plan modification 3-16-15 Architectural: Revise floor plans, north and east elevations and AP9.1 and AP9.2 patio section and details to incorporate roof structure and concrete pavers to exterior patio. Structural: Redesign detailing for patio structure from foundation to new roof. Revise structural calculations and plans including Sheet S1.1 foundation and framing details and S1.2 structural details. Mechanical: Add a hose bib with backflow preventer for drip irrigation at exterior patio. Add a roof drain to new patio roof. Electrical: Revise exterior lighting at new roof patio to add (4) new can lights. Add heat trace for new patio roof drain.**ajs**Proposed exterior modifications include increasing the size of the existing second floor storefront windows in two offices and a conference room on the north and east elevations; creating a new entry portal to support a new 190 sq ft second floor patio on the north elevation out of the President's Office including foundation; Second Floor interior improvements include modifications to the President's Office, Private Conference Room, Private Toilet Room, a new Break Room and two Offices; New finishes and electrical and mechanical modifications to support the new layouts. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/16/20166/17/20166/16/2016APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection4/26/20164/27/20164/28/2016ACANC
DetailsTroy Cobbley
Nathan with TVFP is following up on whether additional coverage is needed under the new balcony.
INSP-Sprinkler Rough-in11/5/201511/6/201511/6/2015APASS
DetailsTroy Cobbley
Second floor bacony piping can be covered.
Permit Ready to Issue  9/17/2015 DONE
Issue and Print Permit  9/17/2015 DONE
Inspection Record Card- Fire9/17/2015 9/17/2015 DONE
DetailsChristina Prado
Intake Approval  9/16/2015 PASS
Plan assigned to (Tim)9/16/2015 9/16/2015 DONE
DetailsTim Frost
Sprinkler Plan Check9/16/2015 9/16/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  9/16/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/16/2015 DONE
DetailsTim Frost
Application received  9/14/2015 DONE
Application submitted via PDS Online on Sep 14 2015 2:22PM