INSP-Final Inspection | 11/23/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/5/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2015 | 10/5/2015 | 10/5/2015 | P | CANC |
Troy Cobbley
|
|
|
Contact - Matt Robison - ###-#### Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Troy Cobbley
|
|
|
underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 9/30/2015 | 10/1/2015 | 10/1/2015 | P | CANC |
Troy Cobbley
|
|
|
No water on site. No hydro performed.
|
INSP-Supply line flush | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | CANC |
Troy Cobbley
|
|
|
No water on site. No flush performed.
|
INSP-Sprinkler Rough-in | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in and tenting inspection passed. Piping can be covered.
|
Permit Ready to Issue | | | 9/23/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/23/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/23/2015 | | 9/23/2015 | | DONE |
Kristal Soland
|
|
|
|
Intake Approval | | | 9/22/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/22/2015 | | 9/22/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/22/2015 | | 9/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/22/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2015 5:08PM
|