INSP-Final Inspection | 12/15/2015 | 12/17/2015 | 12/17/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 10/12/2015 | 10/12/2015 | 10/12/2015 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping is ok to cover. Pat is going to provide additional coverage at second floor main landing sidewall.
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can not be covered until a tenting inspection is passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2015 | 10/7/2015 | 10/6/2015 | A | CANC |
Troy Cobbley
|
|
|
contact - Matt Robison -477 7315 - needs an inspection for an over head hydro inspection and check on tenting/insulation. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 10/5/2015 | 10/6/2015 | 10/6/2015 | P | CANC |
Troy Cobbley
|
|
|
Wrong address called in
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2015 | 10/5/2015 | 10/2/2015 | P | CANC |
Troy Cobbley
|
|
|
Contact is Matt Robison- ###-#### - Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Supply line flush | 10/2/2015 | 10/5/2015 | 10/2/2015 | A | CANC |
Troy Cobbley
|
|
|
Contact is Matt Robison- ###-#### - Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Permit Ready to Issue | | | 9/23/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 9/23/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/23/2015 | | 9/23/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 9/22/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/22/2015 | | 9/22/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/22/2015 | | 9/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/22/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2015 5:14PM
|