INSP-Final Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 10/30/2015 | 11/2/2015 | 11/2/2015 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered
|
INSP-Sprinkler Rough-in | 9/23/2015 | 9/24/2015 | 9/24/2015 | P | PASS |
Troy Cobbley
|
|
|
Piping above hard lids is ok to cover. I noted many upright heads blocked by hanging insulation and flexible ducting. This will need to be addressed prior to the next cover approval.
|
Intake Approval | | | 9/21/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/21/2015 | | 9/21/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/21/2015 | | 9/21/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/21/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/21/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/21/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/21/2015 | | 9/21/2015 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 9/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 20 2015 3:18PM
|