INSP-Final Inspection | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need sticker on the outside alarm bell and overhead and underground test papers.
|
INSP-Final Inspection | 10/11/2016 | 10/13/2016 | 10/13/2016 | A | CANC |
Troy Cobbley
|
|
|
Ron Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 10/11/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro tests passed. The forward flush passed. Interior corrections have been made. Need pressure relief valves, signage on bell and alarm interconnects for a final.
|
INSP-Sprinkler Rough-in | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | PASS |
Jim Page
|
|
|
Rough-in inspection for overhead fire sprinkler piping complete. Items that will be repaired before final inspection will be the addition of a 286 degree fire sprinkler head on level 1, southeast corridor next to ceiling mount heater unit, heads are overspaced in this area. Multiple fire sprinkler heads on the south fire sprinkler branchline are to close to the metal studs, branchline will be shifted to get sprinkler heads in compliance for spacing from the metal studs. Storage unit on level 2, behind elevator has a fire sprinkler head spaced to far off of wall, head will be relocated to correct spacing issue. All items can be checked during final inspection to verify completion.
|
INSP-Supply line flush | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | DONE |
Jim Page
|
|
|
Underground fire sprinkler main supply flush complete.
|
INSP-Conference | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | DONE |
Troy Cobbley
|
|
|
Don brought up questions on the use of sammys in the bottom of z-purlins. I deferred him to Tim Frost who deferred him to the manufacture for approval of the hanging method.
|
Permit Ready to Issue | | | 11/9/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/9/2015 | | 11/9/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 11/2/2015 | | 11/2/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/2/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/22/2015 | | 10/22/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/22/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 10/8/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/8/2015 | | 10/8/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/8/2015 | | 10/8/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/8/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/8/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 9/27/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 27 2015 11:07AM
|