INSP-Final Inspection | 1/26/2016 | 1/27/2016 | 1/27/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 11/25/2015 | 12/1/2015 | 11/30/2015 | A | PASS |
Jim Page
|
|
|
Previously noted items repaired/complete, rough to cover inspection passed/complete, approved for cover.
|
INSP-Sprinkler Rough-in | 11/17/2015 | 11/23/2015 | 11/23/2015 | P | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover except the two pendant heads at the soffit on the east side of the building. These two pendants are still located above the new ceiling grid so they still need to be modified to provide adequate coverage.
|
(F) Reprint permit | | | 11/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/12/2015 | | 11/12/2015 | | DONE |
Kristal Soland
|
|
|
|
Permit Ready to Issue | | | 10/12/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 10/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/12/2015 | | 10/12/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Sprinkler Plan Check | 10/8/2015 | | 10/8/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/8/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2015 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 10/7/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/7/2015 | | 10/7/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 10/6/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 6 2015 10:09AM
|