INSP-Final Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Jim Page
|
|
|
Rough in inspection complete for office area's located on mezzanine as well as elevated storage tanks located in the warehouse.
|
INSP-Sprinkler Rough-in | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection completed for cooler area's, cooler area's approved for cover.
|
INSP-Sprinkler Rough-in | 1/26/2016 | 1/27/2016 | 1/27/2016 | A | PART |
Jim Page
|
|
|
Rough to cover inspection complete for overhead fire sprinkler piping located above hardlids in latrines (Four total) Hardlids in latrines approved for cover.
|
Permit Ready to Issue | | | 11/9/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/9/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/9/2015 | | 11/9/2015 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 11/6/2015 | | 11/6/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2015 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 10/23/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/23/2015 | | 10/23/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/23/2015 | | 10/23/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/23/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/23/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 10/6/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 6 2015 10:55AM
|