INSP-Final Inspection | 5/13/2016 | 5/17/2016 | 5/17/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PART |
Jim Page
|
|
|
Partial final inspection complete, inspection of apartments/garages passed/complete, will be able to be signed off as complete when fire alarm inspection has been performed, verification of signals from flow swith/tamper switches needs to be completed before permit can be finaled.
|
INSP-Supply line flush | 3/1/2016 | 3/3/2016 | 3/3/2016 | A | DONE |
Jim Page
|
|
|
Underground main supply flush complete.
|
INSP-Sprinkler Rough-in | 1/7/2016 | 1/7/2016 | 1/7/2016 | P | PASS |
Jim Page
|
|
|
Tenting inspection passed/complete, all piping for this building approved for cover.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | CANC |
Jim Page
|
|
|
Spoke with Anthony, phone number ###-####, contractor will reschedule this inspection request to coincide with tenting for rough to cover. this inspection request cancelled per conversation with Anthony.
|
INSP-Sprinkler Rough-in | 1/4/2016 | 1/4/2016 | 1/4/2016 | P | PART |
Jim Page
|
|
|
First floor rough to cover inspection passed/complete, approved for cover. 2nd floor piping still needs tenting installed, cannot cover 2nd floor piping until tenting is inspected and approved.
|
INSP-Sprinkler Rough-in/Hydro | 12/21/2015 | 12/22/2015 | 12/22/2015 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test for 2 hours passed/complete for overhead fire sprinkler piping.
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2015 | 12/21/2015 | 12/21/2015 | A | CANC |
Jim Page
|
|
|
Hydrostatic test cancelled per coversation with POC, Anthony phone# ###-####, will be rescheduled for later date.
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | FAIL |
Troy Cobbley
|
|
|
Went back for a second time and was unable to verify test due to contractor draining system after finding a leak.
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | FAIL |
Jim Page
|
|
|
Contractor had a dry fit, system could not hold 200 psi, contractor will reschedule hydrostatic test for overhead.
|
INSP-Sprinkler Rough-in/Hydro | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | CANC |
Jim Page
|
|
|
Please give Jake a call when you are headed out! Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2015 | 12/16/2015 | 12/16/2015 | A | CANC |
Jim Page
|
|
|
Spoke with point of contact, Anthony, phone #: ###-####, project is not ready, he will reschedule inspection for a later date. Inspection request cancelled.
|
Sprinkler Plan Check | 10/20/2015 | | 10/20/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/20/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/20/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/20/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/20/2015 | | 10/20/2015 | | DONE |
Brittany Hill
|
|
|
|
(F) Reprint permit | | | 10/20/2015 | | DONE |
|
|
|
|
Miscellaneous action | | | 10/12/2015 | | PEND |
|
|
|
The project is on hold pending the informal interpretation from NFPA on if these units would be classified as "townhouse style" units. If they are so classified, then each unit would need have a separate water supply.
|
Intake Approval | | | 10/9/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/9/2015 | | 10/9/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 10/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 7 2015 4:15PM
|