INSP-Final Inspection | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete for this FIR permit, will final this FIR permit when core/shell FIR/BLD permits are inspected and complete.
|
INSP-Sprinkler Rough-in | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for cooler/freezer fire sprinkler heads. Rough to cover inspection complete for this FIR permit, all area's approved for cover.
|
Override - Parcel Holds | 11/10/2015 | 1/1/1900 | 11/10/2015 | | |
|
|
|
this is a fire permit not the early start permit
|
INSP-Sprinkler Rough-in | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Troy Cobbley
|
|
|
The piping to the pendant heads in the Service Area is ok to cover.
|
INSP-Sprinkler Rough-in | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for overhead fire sprinkler pipe, approved for cover.
|
INSP-Sprinkler Rough-in | 10/12/2015 | 10/12/2015 | 10/12/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for the hard lids passed/complete, approved for cover.
|
Permit Ready to Issue | | | 10/12/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/12/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/12/2015 | | 10/12/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 10/8/2015 | | PASS |
|
|
|
|
Sprinkler Plan Check | 10/8/2015 | | 10/8/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/8/2015 | | 10/8/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/8/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 10/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 7 2015 4:28PM
|