INSP-Final Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for levels 3 & 4 of annex complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2016 | 9/19/2016 | 9/19/2016 | P | PASS |
Jim Page
|
|
|
Hdrostatic test for level 4 of annex building complete.
|
INSP-Sprinkler Rough-in/Hydro | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | FAIL |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 4 annex partially complete. Sprinkler heads missing in soffit by center stairs, head needs to be added by kitchen hood locedt in the southwest area, head is currently overspaced. Heads in soffit on southeast side spaced to far from edge of soffit, heads need to be relocated. No heads under south stairs from 5 to 4, need to verify head coverage for these stairs. Items need to be corrected before cover is approved.
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2016 | 8/1/2016 | 8/1/2016 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping, level 3 annex passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | CANC |
Jim Page
|
|
|
Hydrostatic test cancelled by point of contact, Jeff phone numnber ###-####, hydrostatic test for annex level 3 will be rescheduled.
|
Sprinkler Plan Check | 10/22/2015 | | 10/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/22/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/22/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/22/2015 | | 10/22/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 10/14/2015 | | 10/14/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/14/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/14/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 10/13/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/13/2015 | | 10/13/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 10/8/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2015 6:19PM
|