INSP-Final Inspection | 3/8/2016 | 3/9/2016 | 3/9/2016 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 2/26/2016 | 2/29/2016 | 2/29/2016 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro failed due to visible loss at guage.
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2016 | 2/25/2016 | 2/25/2016 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Supply line flush | 2/24/2016 | 2/25/2016 | 2/25/2016 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush passed
|
INSP-Supply line flush | 2/10/2016 | 2/11/2016 | 2/11/2016 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PASS |
Troy Cobbley
|
|
|
Rough-in and tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for the underground supply line passed/complete, approved for cover.
|
Intake Approval | | | 10/21/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/21/2015 | | 10/21/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/21/2015 | | 10/21/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/21/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/21/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/21/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/21/2015 | | 10/21/2015 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 10/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2015 1:57PM
|