INSP-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PASS |
Troy Cobbley
|
|
|
2nd floor hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 12/7/2015 | 12/8/2015 | 12/8/2015 | P | PART |
Troy Cobbley
|
|
|
Overhead hydro of the first floor passed. The overhead hydro of the second floor failed twice.
|
INSP-Sprinkler Rough-in | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered.
|
Permit Ready to Issue | | | 10/22/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/22/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/22/2015 | | 10/22/2015 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 10/20/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/20/2015 | | 10/20/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/20/2015 | | 10/20/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/20/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 10/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2015 2:40PM
|