Case Summary | | | 6/6/2016 | | DONE |
|
|
|
|
INSP-Final Inspection | 12/11/2015 | 12/14/2015 | 12/14/2015 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection completed on 11DEC2015, including unit shutdown for the HVAC unti that was no operating correctly.
|
INSP-Final Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 12/9/2015 | 12/11/2015 | 12/11/2015 | A | CANC |
Jim Page
|
|
|
Inspection request for fire alarm final, canceling this inspection and correcting inspection request
|
Alarm Plan Check | 12/3/2015 | | 12/3/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/3/2015 | | DONE |
|
|
|
3 plan review approved with review comments.
|
Permit Ready to Issue | | | 12/3/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/3/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/3/2015 | | 12/3/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 12/2/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/24/2015 | | DONE |
|
|
|
|
Alarm Plan Check | 11/24/2015 | | 11/24/2015 | | FAIL |
Lee G Meredith
|
|
|
Numerous corrections still need to be made. See 2nd review comments.
|
Plan assigned to (Lee) | 10/15/2015 | | 10/15/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 10/15/2015 | | FAIL |
|
|
|
See review comments.
|
Miscellaneous action | | | 10/15/2015 | | DONE |
|
|
|
Emailed review comments to applicant.
|
Telephone call | | | 10/14/2015 | | DONE |
|
|
|
Gary called to ask if Boise City allowed work to be performed prior to permit issuance. I informed him that the policy states that conduit imbedded in concrete is allowed but nothing beyond that.
|
Application received | | | 10/13/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 13 2015 4:08PM
|