Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR15-00748
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 509 E PARKCENTER BLVD
Project NameDistrict@Parkcenter InTown A-2
Customer Number 
ePlanReviewYes
Description
Shilo will install a complete 13R fire sprinkler system per NFPA 13R, 2013, and the City of Boise into the new 3 story apartment complex.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/30/20168/31/20168/31/2016APASS
DetailsJim Page
Final fire alarm inspection passed/complete
INSP-Sprinkler Rough-in5/24/20165/24/20165/24/2016PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete, piping that is not exposed to attic spaces approved for cover. Fire sprinkler piping located in attic spaces cannot be covered until tenting inspection is performed and approved.
INSP-Sprinkler Rough-in4/13/20164/13/20164/13/2016PPASS
DetailsJim Page
Previously noted tenting/insulation items repaired, all of third level approved for cover.
INSP-Sprinkler Rough-in3/28/20163/29/20163/29/2016AFAIL
DetailsJim Page
3rd level piping not approved for cover, some area's have exposed piping in the attic area with no insulation tenting cover. Main fire sprinkler feed for the third level is wrapped with insulation, piping needs to have clear pocket between sheetrock and piping to help prevent freezing. Notified general contractor of issues, 3rd level east side will need to be inspected again to verify corrections before cover can be approved.
INSP-Sprinkler Rough-in3/9/20163/10/20163/10/2016PPART
DetailsJim Page
Tenting inspection complete for the west side of the fire doors located on the third level. Overhead fire sprinkler piping on west side of 3rd level fire doors approved for cover, east side still needs tenting insulation installed and inspection performed. Third level, east side of fire doors cannot be covered until inspection of tenting is completed.
INSP-Sprinkler Rough-in/Hydro2/24/20162/25/20162/25/2016PPASS
DetailsJim Page
Overhead fire sprinker hydrostatic test passed/complete for 1st floor, 2nd floor and 3rd floor. All hydrostatic tests complete for building A-2.
INSP-Sprinkler Rough-in2/17/20162/19/20162/19/2016APART
DetailsJim Page
Rough to cover inspection complete for 1st and 2nd level, building A-2, overhead fire sprinkler piping approved for cover. Third level rough to cover inspection performed, inspection passed for rough-in, piping on third level cannot be covered until tenting/insulation inspection is completed.
Sprinkler Plan Check10/30/2015 10/30/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  10/30/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/30/2015 DONE
DetailsTim Frost
Permit Ready to Issue  10/30/2015 DONE
Issue and Print Permit  10/30/2015 DONE
Inspection Record Card- Fire10/30/2015 10/30/2015 DONE
DetailsCandy A. Nichols
Intake Approval  10/29/2015 PASS
Plan assigned to (Tim)10/29/2015 10/29/2015 DONE
DetailsTim Frost
Application received  10/22/2015 DONE
Application submitted via PDS Online on Oct 22 2015 5:36PM