Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR15-00755
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 10 N LIBERTY ST Unit: 130
Project NameMark Guho Const. Office TI
Customer Number 
ePlanReviewYes
Description
[MARK GUHO CONSTRUCGTION COMPANY (SUITE 130)]- Quick Permit
Relocation and demo of pendent sprinkler on flexible drops and addition of sprinklers at shop space do to new wall layout.

(MARK GUHO CONSTRUCGTION COMPANY)(SUITE 130) This building was constructed under BLD00-02588 core and shell and BLD02-00013 for the vanilla finish. Minor demolitions per approved plans. This building is fully fire spinklered. Scope of work to include interior partition walls for new layout including 2 new ADA compliant restrooms. New reception counter shall meet ADA requirements. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/6/201511/9/201511/9/2015APASS
DetailsTroy Cobbley
Permit finaled
Permit Ready to Issue  11/5/2015 DONE
Issue and Print Permit  11/5/2015 DONE
Inspection Record Card- Fire11/5/2015 11/5/2015 DONE
DetailsCandy A. Nichols
(F) Reprint permit  11/5/2015 DONE
(F) Reprint permit  11/5/2015 DONE
DetailsChristina Prado
Sprinkler Plan Check11/4/2015 11/4/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/4/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/4/2015 DONE
DetailsTim Frost
Plan assigned to (Tim)10/29/2015 10/29/2015 DONE
DetailsTim Frost
Sprinkler Plan Check10/29/2015 10/29/2015 FAIL
DetailsTim Frost
Application received  10/27/2015 DONE
Application submitted via PDS Online on Oct 27 2015 8:39AM
Intake Approval  10/27/2015 PASS
Plan assigned to (Tim)10/27/2015 10/27/2015 DONE
DetailsTim Frost
Sprinkler Plan Check10/27/2015 10/27/2015 FAIL
DetailsTim Frost
1st review completed  10/27/2015 FAIL
DetailsTim Frost