INSP-Final Inspection | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Miscellaneous action | | | 2/18/2016 | | DONE |
|
|
|
John Lopez provided as built drawings that indicate notification device and power supply changes from the original drawings. These have been accepted and approved.
|
Miscellaneous action | | | 2/18/2016 | | DONE |
|
|
|
Notified Troy Cobbly via email that the as built drawings are acceptable but previously noted audible sync issues are to be verified as corrected.
|
INSP-Final Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | FAIL |
Troy Cobbley
|
|
|
We tested the a/v's and found an audible sync problem, the NAC installed is not the one submitted and the notification devices are now ceiling mount.
|
Plan assigned to (Lee) | 11/3/2015 | | 11/4/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 11/4/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 11/4/2015 | | 11/4/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/4/2015 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 11/4/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 11/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/4/2015 | | 11/4/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 11/2/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 2 2015 12:15PM
|