Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR15-00793
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 7610 W STATE ST
Project NameNorth Point Retail Bldg. 3
Customer NumberUDG ONLY
ePlanReviewYes
Description
[NORTH POINTE RETAIL / RESTURANT – BLDG #3 – Shell and Core - Udg Only]
Fire Sprinkler Supply Underground 6"x127'+- C-900 piping with associated fittings and thrust blocks.

(NORTH POINTE RETAIL / RESTURANT – BLDG #3 – Shell and Core) Permit is to construct a 7,564 square foot Retail / Office / Assembly Shell building. This building is constructed as a wood frame building and a concrete footing. Work includes: new foundation, new exterior walls, new mechanical, stubbing in plumbing into the building, site work, new wood frame exterior walls, new manufactured wood truss roof system, and new electrical (Exterior Lighting Approved). This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: In accordance with Section C401.2 option #1 of the 2012 IECC; ANSI/ASHREA/IESNA 90.1 were used to show compliance with the Energy Code. The lighting installed within the tenant spaces shall also comply with ASHREA. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/24/20163/25/20163/25/2016APASS
DetailsJim Page
Underground final inspection complete
INSP-Sprinkler Rough-in/Hydro3/24/20163/25/20163/25/2016APASS
DetailsJim Page
Underground hydrostatic complete
INSP-Sprinkler Rough-in3/1/20163/1/20163/1/2016PPASS
DetailsJim Page
Rough to cover inspection performed on 18NOV2015 for underground piping, underground was approved for cover at that inspection.
INSP-Supply line flush2/28/20162/29/20162/29/2016PDONE
DetailsJim Page
Underground main line flush complete.
INSP-Sprinkler Rough-in/Hydro2/28/20162/29/20162/29/2016APASS
DetailsJim Page
Hydrostatic test, 2 hours @ 200 psi complete for underground supply.
INSP-Supply line flush2/24/20162/26/20162/26/2016PCANC
DetailsJim Page
Inspection request cancelled per conversation with Robert, phone number ###-####, will reschedule for later date.
INSP-Sprinkler Rough-in/Hydro2/24/20162/26/20162/26/2016APASS
DetailsJim Page
Underground main supply hydrostatic test complete.
Intake Approval  11/6/2015 PASS
Plan assigned to (Tim)11/6/2015 11/6/2015 DONE
DetailsTim Frost
Sprinkler Plan Check11/6/2015 11/6/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/6/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/6/2015 DONE
DetailsTim Frost
Permit Ready to Issue  11/6/2015 DONE
all requirments met
Issue and Print Permit  11/6/2015 DONE
Application received  11/4/2015 DONE
Application submitted via PDS Online on Nov 4 2015 3:10PM