INSP-Final Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
INSP-Final Inspection | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PART |
Jim Page
|
|
|
Final alarm testing complete for phase 2, contractor will schedule final inspection for phase 3 when complete.
|
INSP-Final Inspection | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contatct, Morgan Phone #: ###-####, contractor will reschedule inspection for later date.
|
INSP-Final Inspection | 1/7/2016 | 1/8/2016 | 1/8/2016 | A | PART |
Troy Cobbley
|
|
|
Todays inspection was just to verify that the visual devices sync'd in phase one which they did.
|
INSP-Final Inspection | 12/30/2015 | 12/30/2015 | 12/30/2015 | P | FAIL |
Jim Page
|
|
|
Verified spacing and placement of Audio/Visual devices. Area of inspection passed for device placement, strobes need to be syncronized together when strobes are in same area. Contractor will reschedule inspection when sync issue repaired.
|
Telephone call | | | 12/9/2015 | | DONE |
|
|
|
Rob Ahten called to say the owner has decided to replace existing notification devices throughout the building in existing locations. New devices will have a lower current draw that existing. I told him resubmittal would not be required. He sent new product data that has been added to Projectdox.
|
Plan assigned to (Lee) | 11/13/2015 | | 11/13/2015 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 11/13/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 11/13/2015 | | 11/13/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/13/2015 | | DONE |
|
|
|
Quick permit approved with drawing notes and requirements.
|
Permit Ready to Issue | | | 11/13/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 11/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/13/2015 | | 11/13/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Application received | | | 11/5/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 5 2015 9:45AM
|