Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR15-00795
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 2244 E WALLING DR
Project NameFalling Brook Condos Bldg 5
Customer Number 
ePlanReviewYes
Description
[Falling Brook Condos Building #5]
The fire sprinkler scope of work consists of protection a 11 unit 2 level condominium. The protection is designed per NFPA13R. The system utilizes CPVC piping and extended coverage residential sprinklers.

(FALLING BROOK CONDOS – Building #5) Permit is to construct a 11 unit 19,397 square foot residential apartment building with 10,549 sq. ft. on the first story and 8,848 sq. ft. on the second story. This building is fully fire sprinklered for the R2 occupancy. All work per the approved plans and the attached engineering. This building is ground up construction including foundation and flatwork. The building has one type A accessible unit on the west end of the building. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/28/20167/29/20167/29/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete. Contractor will be hanging headbox in riser room as well as signage for fire sprinkler riser door. Items will be verified at final life fire safety inspection.
INSP-Final Inspection7/27/20167/28/20167/28/2016PCANC
DetailsJim Page
Please call Jake when you are headed out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Final Inspection7/20/20167/22/20167/21/2016ACANC
DetailsJim Page
Please call Jake when you are headed out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in4/12/20164/13/20164/13/2016APASS
DetailsJim Page
Rough to cover inspection for tenting complete, all fire sprinkler piping in this building approved for cover.
INSP-Supply line flush3/1/20163/4/20163/4/2016ADONE
DetailsJim Page
Underground main line flush complete.
INSP-Sprinkler Rough-in3/2/20163/2/20163/2/2016PPASS
DetailsJim Page
Rough to cover inspection complete for 1st level, all of 1st level approved for cover. Contractor will schedule inspection for 2nd level when tenting is complete.
INSP-Sprinkler Rough-in2/29/20163/1/20163/1/2016PFAIL
DetailsJim Page
Rough to cover inspection performed, cover is not approved, numorous hangers are overspaced, hanger spacing needs to be corrected throughout entire building before cover is approved.
INSP-Sprinkler Rough-in/Hydro2/29/20162/29/20162/29/2016PFAIL
DetailsJim Page
Rough to cover inspection performed, cover is not approved, inspection stopped after finding numorous hangers that are overspaced, hanger spacing needs to be corrected throughout entire building before cover is approved.
INSP-Sprinkler Rough-in/Hydro2/26/20162/29/20162/29/2016PPASS
DetailsJim Page
Overhead hydrostatic test, 2 hours @ 200psi passed/complete.
INSP-Sprinkler Rough-in/Hydro2/26/20162/26/20162/26/2016PCANC
DetailsJim Page
Please call Anthony before you head out! Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Supply line flush12/17/201512/17/201512/17/2015PPASS
DetailsJim Page
Inspection request was for an underground hydrostatic test, 2 hours @ 200 psi hydrostatic test for underground passed/complete. Main line supply still needs flushed.
INSP-Supply line flush12/16/201512/17/201512/17/2015ACANC
DetailsJim Page
Underground hydro. Call Jake when heading out! Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
Permit Ready to Issue  12/3/2015 DONE
Issue and Print Permit  12/3/2015 DONE
Inspection Record Card- Fire12/3/2015 12/3/2015 DONE
DetailsKristal Soland
Sprinkler Plan Check11/20/2015 11/20/2015 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  11/20/2015 DONE
DetailsTim Frost
1st review completed  11/20/2015 FAIL
DetailsTim Frost
Intake Approval  11/9/2015 PASS
Plan assigned to (Tim)11/9/2015 11/9/2015 DONE
DetailsTim Frost
Application received  11/6/2015 DONE
Application submitted via PDS Online on Nov 6 2015 1:28PM