INSP-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping complete.
|
INSP-Supply line flush | 8/19/2016 | 8/22/2016 | 8/22/2016 | P | DONE |
Jim Page
|
|
|
Underground main supply line flush complete
|
INSP-Sprinkler Rough-in | 8/16/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Page
|
|
|
Tenting inspection for overhead fire sprinkler piping located in attic spaces complete, overhead fire sprinkler piping located in attic area's approved for cover.
|
INSP-Sprinkler Rough-in | 8/10/2016 | 8/10/2016 | 8/10/2016 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete. Overhead fire sprinkler piping located between living area's approved for cover, overhead fire sprinkler piping located in attic spaces cannot be covered until a tenting insulation inspection has been completed.
|
INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Jim Page
|
|
|
Tenting inspection complete for level 3, all overhead fire sprinkler piping located in the attic space of level 3 approved for cover.
|
INSP-Sprinkler Rough-in | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PART |
Jim Page
|
|
|
Rough to cover/tenting inspection for overhead fire sprinkler piping complete for northeast section of level 3, overhead fire sprinkler piping in the northeast section of level 3 approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2016 | 6/20/2016 | 6/20/2016 | A | CANC |
Jim Page
|
|
|
Inspection request re-scheduled per conversation with Mark, phone number ###-#### due to pressure loss for the hydrostatic test.
|
INSP-Sprinkler Rough-in | 6/8/2016 | 6/9/2016 | 6/9/2016 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete for level one, level one approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2016 | 6/9/2016 | 6/9/2016 | P | PART |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping located on level one complete.
|
Plan Modification Accepted | | | 5/26/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/26/2016 | | 5/26/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/26/2016 | | DONE |
|
|
|
plan mod fees
|
CHANGE STATUS TO (ISS) | | | 5/26/2016 | | DONE |
|
|
|
plan mod fees paid
|
Sprinkler Plan Check | 12/4/2015 | | 12/4/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/4/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/4/2015 | | 12/4/2015 | | DONE |
Kristal Soland
|
|
|
|
Intake Approval | | | 11/13/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/13/2015 | | 11/13/2015 | | DONE |
Tim Frost
|
|
|
|
1st review completed | | | 11/13/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/13/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 11/13/2015 | | 11/13/2015 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 11/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 12 2015 2:00PM
|