Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR15-00809
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 517 E PARKCENTER BLVD
Project NameDistrict @ Parkcenter Cottage
Customer Number 
ePlanReviewYes
Description
[The District at Park Center - Cottage Building A - #2]
The fire sprinkler scope of work consists of protecting a two level apartment building per NFPA 13R. The system is supplied by 4”x50’ ± C-900 underground piping. Extended coverage residential sprinklers and CPVC piping are being utilized.

Plan Mod #1
Installed pendents instead of sidewalls in the SW and SE corner of the first floor

(THE DISTRICT AT PARKCENTER - COTTAGE BUILDING A - #2) (The drawings are filed under permit BLD14-01818 in ePlanReview) To construct a 10 dwelling unit two story apartment building with each unit having its own garage (i.e. 10 garages). The total floor area of this building is about 14,708 square feet (8,374 square feet 1st story and 6,334 square feet 2nd story). All ground floor units are required to comply as Type B units. Two of those ground floor units within Cottage Building A - #2 are required to comply as Type A units. Work is to include interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations, attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, common stairways within a 1-hr corridor, private interior stairways, garages, garage overhead doors, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/10/201610/12/201610/12/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
INSP-Sprinkler Rough-in7/12/20167/13/20167/13/2016PCANC
DetailsJim Page
Not ready for rough in inspection for overhead sprinkler piping for level 3, area's on level 3 missing tenting insulation, insulation needs to be completely installed for rough in inspection for cover to be approved.
INSP-Sprinkler Rough-in/Hydro7/12/20167/13/20167/13/2016PPASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping complete for level 3, overhead fire sprinkler hydrostaic test for this building complete.
INSP-Sprinkler Rough-in/Hydro5/31/20166/1/20166/1/2016APASS
DetailsJim Page
200 psi hydrostatic test for overhead fire sprinkler piping complete for entire building.
Plan Modification Accepted  5/26/2016 DONE
Sprinkler Plan Check5/26/2016 5/26/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/26/2016 DONE
Permit Ready to Issue  5/26/2016 DONE
plan mod fees paid
CHANGE STATUS TO (ISS)  5/26/2016 DONE
plan mod fees paid
Sprinkler Plan Check12/10/2015 12/10/2015 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  12/10/2015 DONE
DetailsTim Frost
Permit Ready to Issue  12/10/2015 DONE
Issue and Print Permit  12/10/2015 DONE
Inspection Record Card- Fire12/10/2015 12/10/2015 DONE
DetailsCandy A. Nichols
Intake Approval  11/13/2015 PASS
Plan assigned to (Tim)11/13/2015 11/13/2015 DONE
DetailsTim Frost
Sprinkler Plan Check11/13/2015 11/13/2015 FAIL
DetailsTim Frost
1st review completed  11/13/2015 FAIL
DetailsTim Frost
Miscellaneous action  11/13/2015 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  11/12/2015 DONE
Application submitted via PDS Online on Nov 12 2015 3:30PM