Permit Information
Permit NumberFIR15-00820
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 111 S BROADWAY AVE
Project NameTIN ROOF TACOS T.I.
Customer Number 
ePlanReviewYes
Description
[Tin Roof Tacos]
INSTALL NEW PENDENT HEADS TO THE NEW WALL AND CEILING LAYOUT. INSTALL A NEW DRY SYSTEM UNDER THE NEW EXTERIOR RESTAURANT SEATING CANOPY.

Restaurant TI including new partitions, commercial kitchen with Type 1 hood, interior finishes, patio roof structure
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/21/20161/21/20161/21/2016PPASS
DetailsJim Page
Previously noted items repaired, final fire sprinkler inspection passed/complete.
INSP-Final Inspection1/16/20161/19/20161/19/2016APART
DetailsJim Page
Trip test for dry system complete, final fire sprinkler inspection complete, dry pendant heads for dry system canopy are too long, dry pendant heads on order and will be replaced when received, once heads are changed the fire sprinkler system can be finaled.
INSP-Sprinkler Rough-in/Hydro1/15/20161/15/20161/15/2016PPASS
DetailsJim Page
24 hour air test passed/complete for dry system.
INSP-Sprinkler Rough-in/Hydro1/14/20161/14/20161/14/2016PPART
DetailsJim Page
2 hour hydrostatic test @ 200 psi passed/complete for dry system. 24 hour air test started at 1430hrs @ 45psi.
INSP-Final Inspection1/14/20161/15/20161/14/2016ACANC
DetailsJim Page
Please call Don with time frame. Trip test dry system and final. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
INSP-Sprinkler Rough-in1/13/20161/13/20161/13/2016PPASS
DetailsJim Page
Rough to cover inspection passed/complete for tenant space, all fire sprinkler piping for this tenant space approved for cover.
Permit Ready to Issue  11/23/2015 DONE
Issue and Print Permit  11/23/2015 DONE
Inspection Record Card- Fire11/23/2015 11/23/2015 DONE
DetailsCandy A. Nichols
Intake Approval  11/20/2015 PASS
Plan assigned to (Tim)11/20/2015 11/20/2015 DONE
DetailsTim Frost
Sprinkler Plan Check11/20/2015 11/20/2015 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/20/2015 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/20/2015 DONE
DetailsTim Frost
Application received  11/16/2015 DONE
Application submitted via PDS Online on Nov 16 2015 11:41AM