INSP-Final Inspection | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for this permit on level 7 passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for level 7, hydrostatic test complete for overhead fire sprinkler piping on level 7, tamper switch and flow switch satisfactorily tested for level 7.
|
INSP-Sprinkler Rough-in | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for fire sprinkler piping above gridded area's on level 7 complete, fire sprinkler above gridded area's approved for cover.
|
INSP-Sprinkler Rough-in | 1/12/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Jim Page
|
|
|
Rough in inspection complete, notated with red ink on city approved drawings area's inspected
|
Permit Ready to Issue | | | 12/21/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 12/21/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/21/2015 | | 12/21/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Sprinkler Plan Check | 12/16/2015 | | 12/16/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/16/2015 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 12/9/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/9/2015 | | 12/9/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/8/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 8 2015 11:20AM
|