Permit Information
Permit NumberFIR15-00865
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 7610 W STATE ST
Project NameNorth Point Building #3
Customer Number 
ePlanReviewYes
Description
[North Pointe Retail Building #3 - Shell & Core]
The fire sprinkler scope of work consists of 6”x135’± C-900 underground pipe and fittings with thrust blocks. The system is protected as a tree type 4” dry system with a 4” backflow preventer.

(NORTH POINTE RETAIL / RESTURANT – BLDG #3 – Shell and Core) Permit is to construct a 7,564 square foot Retail / Office / Assembly Shell building. **PLAN MODIFICATION** 12-4-15 - Plan Modification to add a wall that will make this two separate tenant spaces in the future. No additional permit required at this point. **TLW** This building is constructed as a wood frame building and a concrete footing. Work includes: new foundation, new exterior walls, new mechanical, stubbing in plumbing into the building, site work, new wood frame exterior walls, new manufactured wood truss roof system, and new electrical (Exterior Lighting Approved). This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: In accordance with Section C401.2 option #1 of the 2012 IECC; ANSI/ASHREA/IESNA 90.1 were used to show compliance with the Energy Code. The lighting installed within the tenant spaces shall also comply with ASHREA. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/24/20163/25/20163/25/2016APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in3/24/20163/25/20163/25/2016APASS
DetailsJim Page
Rough to cover inspection complete, approved for cover.
INSP-Sprinkler Rough-in/Hydro3/24/20163/25/20163/25/2016APASS
DetailsJim Page
Overhead hydrostatic test complete, 24 hour air test complete
INSP-Sprinkler Rough-in2/29/20163/1/20163/1/2016PFAIL
DetailsJim Page
End of line seismic bracing missing on northwest branchlines.
INSP-Supply line flush2/29/20163/1/20163/1/2016PDONE
DetailsJim Page
Underground main supply line flush complete
INSP-Sprinkler Rough-in/Hydro2/24/20162/29/20162/29/2016ACANC
DetailsJim Page
Inspection request cancelled per conversation with Robert, phone number ###-####, contractor will reshcedule hydrostatic test when water is turned on.
Permit Ready to Issue  1/5/2016 DONE
Issue and Print Permit  1/5/2016 DONE
Inspection Record Card- Fire1/5/2016 1/5/2016 DONE
DetailsChristina Prado
Sprinkler Plan Check1/4/2016 1/4/2016 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  1/4/2016 DONE
DetailsTim Frost
Sprinkler Plan Check12/28/2015 12/28/2015 FAIL
DetailsTim Frost
Intake Approval  12/11/2015 PASS
Plan assigned to (Tim)12/11/2015 12/11/2015 DONE
DetailsTim Frost
Sprinkler Plan Check12/11/2015 12/11/2015 FAIL
DetailsTim Frost
1st review completed  12/11/2015 FAIL
DetailsTim Frost
Miscellaneous action  12/11/2015 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  12/9/2015 DONE
Application submitted via PDS Online on Dec 9 2015 2:16PM