INSP-Final Inspection | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Jim Page
|
|
|
Overhead hydrostatic test complete, 24 hour air test complete
|
INSP-Sprinkler Rough-in | 2/29/2016 | 3/1/2016 | 3/1/2016 | P | FAIL |
Jim Page
|
|
|
End of line seismic bracing missing on northwest branchlines.
|
INSP-Supply line flush | 2/29/2016 | 3/1/2016 | 3/1/2016 | P | DONE |
Jim Page
|
|
|
Underground main supply line flush complete
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2016 | 2/29/2016 | 2/29/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Robert, phone number ###-####, contractor will reshcedule hydrostatic test when water is turned on.
|
Permit Ready to Issue | | | 1/5/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/5/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/5/2016 | | 1/5/2016 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 1/4/2016 | | 1/4/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/28/2015 | | 12/28/2015 | | FAIL |
Tim Frost
|
|
|
|
Intake Approval | | | 12/11/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/11/2015 | | 12/11/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/11/2015 | | 12/11/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/11/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/11/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 12/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 9 2015 2:16PM
|