INSP-Final Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Sprinkler Rough-in | 1/29/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for this permit, overhead fire sprinkler piping approved for cover. approved for cover.
|
Plan assigned to (Tim) | 1/22/2016 | | 1/22/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/22/2016 | | 1/22/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/22/2016 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/22/2016 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 12/22/2015 | | 12/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/22/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/22/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/22/2015 | | 12/22/2015 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 12/16/2015 | | 12/16/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/16/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/16/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 12/15/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/15/2015 | | 12/15/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 14 2015 10:29AM
|