INSP-Final Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Jim Page
|
|
|
Hydrostatic test was completed before final inspection under this inspection request. Final fire sprinkler inspection passed/complete.
|
INSP-Sprinkler Rough-in | 5/2/2016 | 5/2/2016 | 5/2/2016 | P | DONE |
Katie Marron
|
|
|
Underground flush completed satisfactorily.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete, tenting inspection for overhead piping complete, rough in inspection complete, approved for cover.
|
INSP-Sprinkler Rough-in | 12/31/2015 | 12/31/2015 | 12/31/2015 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled, contractor will schedule rough to cover inspection after tenting of the overhead fire sprinkler piping is complete.
|
Sprinkler Plan Check | 12/22/2015 | | 12/22/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/22/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/22/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/22/2015 | | 12/22/2015 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 12/18/2015 | | 12/18/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/18/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/18/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 12/17/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/17/2015 | | 12/17/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/14/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 14 2015 1:58PM
|