INSP-Final Inspection | 3/1/2016 | 3/2/2016 | 3/2/2016 | A | PASS |
Jim Page
|
|
|
FInal fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for project, all overhead fire sprinkler piping approved for cover.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PART |
Jim Page
|
|
|
Rough in inspection passed/complete for overhead fire sprinkler piping, overhead piping still needs tenting, overhead fire sprinkler piping is not approved for cover until tenting is inspected and approved.
|
Sprinkler Plan Check | 12/31/2015 | | 12/31/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/31/2015 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 12/31/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/31/2015 | | 12/31/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Sprinkler Plan Check | 12/17/2015 | | 12/17/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/17/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/17/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 12/16/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/16/2015 | | 12/16/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 15 2015 11:17AM
|