Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR15-00885
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project NameALBERTSONS G.O. PHASE 3
Customer Number 
ePlanReviewYes
Description
[Albertson General Offices Phase 3]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

Remove selected walls, doors, and finishes to be replaced with new walls, doors, and finishes of portion of 1st floor south. New lighting to be added to the area of improvements.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/20/20171/23/20171/23/2017APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/18/20171/19/20171/19/2017ACANC
DetailsTroy Cobbley
To be canceled per general contractor. To be rescheduled.
INSP-Sprinkler Rough-in4/13/20164/14/20164/14/2016APASS
DetailsJim Page
rough to cover inspection complete for phase 2, phase 2 approved for cover.
INSP-Final Inspection3/17/20163/17/20163/17/2016PPART
DetailsJim Page
Project being worked in phases, inspected fire sprinkler system in area being labeled as phase 1, area inspected passed/complete for final inspection. Inspection will be schedule at a later date for phase 2 area.
INSP-Sprinkler Rough-in1/21/20161/22/20161/22/2016APASS
DetailsJim Page
Project being worked in phases, rough to cover inspection complete for part of first floor, notated the city approved drawings with red ink area's approved for cover.
Sprinkler Plan Check12/31/2015 12/31/2015 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  12/31/2015 DONE
DetailsTim Frost
Issue and Print Permit  12/31/2015 DONE
Inspection Record Card- Fire12/31/2015 12/31/2015 DONE
DetailsBrittany Hill
Intake Approval  12/18/2015 PASS
Plan assigned to (Tim)12/18/2015 12/18/2015 DONE
DetailsTim Frost
Sprinkler Plan Check12/18/2015 12/18/2015 FAIL
DetailsTim Frost
1st review completed  12/18/2015 FAIL
DetailsTim Frost
Miscellaneous action  12/18/2015 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  12/17/2015 DONE
Application submitted via PDS Online on Dec 17 2015 8:28AM