INSP-Final Inspection | 1/20/2017 | 1/23/2017 | 1/23/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/18/2017 | 1/19/2017 | 1/19/2017 | A | CANC |
Troy Cobbley
|
|
|
To be canceled per general contractor. To be rescheduled.
|
INSP-Sprinkler Rough-in | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Jim Page
|
|
|
rough to cover inspection complete for phase 2, phase 2 approved for cover.
|
INSP-Final Inspection | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PART |
Jim Page
|
|
|
Project being worked in phases, inspected fire sprinkler system in area being labeled as phase 1, area inspected passed/complete for final inspection. Inspection will be schedule at a later date for phase 2 area.
|
INSP-Sprinkler Rough-in | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | PASS |
Jim Page
|
|
|
Project being worked in phases, rough to cover inspection complete for part of first floor, notated the city approved drawings with red ink area's approved for cover.
|
Sprinkler Plan Check | 12/31/2015 | | 12/31/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2015 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 12/31/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/31/2015 | | 12/31/2015 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 12/18/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/18/2015 | | 12/18/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/18/2015 | | 12/18/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/18/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/18/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 12/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 17 2015 8:28AM
|