INSP-Final Inspection | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for level 5 passed/complete
|
INSP-Sprinkler Rough-in | 1/12/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Jim Page
|
|
|
Rough in inspection complete, notated with red ink on city approved drawings area's inspected
|
Intake Approval | | | 1/4/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/4/2016 | | 1/4/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/4/2016 | | 1/4/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/4/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/4/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/4/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/4/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/4/2016 | | 1/4/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 12/29/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 29 2015 11:07AM
|