INSP-Final Inspection | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Annual inspection is being performed by Shilo Automatic Sprinkler. I noted that the existing backflow preventer is "surging" which is causing the flow switch to continually acivated.
|
INSP-Final Inspection | 5/2/2016 | 5/4/2016 | 5/4/2016 | A | CANC |
Troy Cobbley
|
|
|
Canceled due to fire alarm issues.
|
INSP-Conference | 4/20/2016 | 4/22/2016 | 4/22/2016 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed
|
INSP-Conference | 4/20/2016 | 4/21/2016 | 4/21/2016 | A | DONE |
Troy Cobbley
|
|
|
Air test started at 9:30. See pressure marked on guage.
|
INSP-Sprinkler Rough-in/Hydro | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test (200psi) passed.
|
CHANGE STATUS TO (ISS) | | | 4/18/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 4/14/2016 | | 4/14/2016 | | DONE |
Tim Frost
|
|
|
|
Plan Modification Accepted | | | 4/14/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/14/2016 | | 4/14/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2016 | | DONE |
Tim Frost
|
|
|
|
INSP-Sprinkler Rough-in | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PART |
Troy Cobbley
|
|
|
Rough-in inspection mostly passed. Missing earthquake bracing. Missing flexible couplings at top of risers. Missing clearance at piping penatration into new building. Missing information on plans showing how long the sprig ups should be. Don't know if sprig ups and the way the riser nipples are installed are approved since they are not shown on the plans. Need verification from plan review. Need air maintenance device.
|
Sprinkler Plan Check | 1/12/2016 | | 1/12/2016 | | FAIL |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/12/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/12/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/12/2016 | | 1/12/2016 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 1/8/2016 | | 1/8/2016 | | FAIL |
Tim Frost
|
|
|
|
Intake Approval | | | 1/4/2016 | | |
|
|
|
|
Plan assigned to (Tim) | 1/4/2016 | | 1/4/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/4/2016 | | 1/4/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/4/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/4/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 12/30/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 30 2015 4:16PM
|