INSP-Final Inspection | 2/18/2016 | 2/19/2016 | 2/19/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/6/2016 | 1/6/2016 | 1/6/2016 | P | PART |
Troy Cobbley
|
|
|
A temp is being given until the sync module is installed. I had a conversation with State Fire the general contractor and the building maintenance supervisor about what has been installed to match existing does not meet current code for syncing of visual and audio devices and that when another remodel is this area all devices will need to be brought up to current code. All parties agreed and the building supervisor stated that a total alarm upgrade was in the works.
|
Plan assigned to (Lee) | 1/4/2016 | | 1/4/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/4/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 1/4/2016 | | 1/4/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/4/2016 | | DONE |
|
|
|
Quick permit approved without review comments.
|
Permit Ready to Issue | | | 1/4/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/4/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/4/2016 | | 1/4/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 12/30/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 30 2015 5:47PM
|