INSP-Supply line flush | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed.
|
INSP-Final Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 5/27/2016 | 5/31/2016 | 5/31/2016 | A | PASS |
Troy Cobbley
|
|
|
Remaining underground supply piping is ok to cover.
|
INSP-Sprinkler Rough-in | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PASS |
Troy Cobbley
|
|
|
An additional lenght of piping is ok for cover. Tie-in to the Suez tap is taking place.
|
INSP-Sprinkler Rough-in | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Troy Cobbley
|
|
|
The two pieces of 10" underground supply piping from the previously approved stub out heading towards the street are ok to cover.
|
INSP-Supply line flush | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was not a flush. Underground supply line ok to cover from the building riser out 20'. See the city approved plans for clouded area.
|
Permit Ready to Issue | | | 1/6/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/6/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/6/2016 | | 1/6/2016 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 1/5/2016 | | 1/5/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2016 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 1/4/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/4/2016 | | 1/4/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/4/2016 | | 1/4/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/4/2016 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 12/31/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 31 2015 7:52AM
|