INSP-Final Inspection | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 3/25/2016 | 3/28/2016 | 3/28/2016 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for overhead sprinkler has been completed, 24hr air test for overhead dry system has been completed, rough in sinpection passed/complete
|
Intake Approval | | | 1/5/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/5/2016 | | 1/5/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/5/2016 | | 1/5/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/5/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/5/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/5/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/5/2016 | | 1/5/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 12/31/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 31 2015 8:32AM
|