INSP-Final Inspection | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for level 8 passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for level 8, hydrostatic test complete for overhead fire sprinkler piping on level 8, tamper switch and flow switch satisfactorily tested for level 8.
|
INSP-Sprinkler Rough-in | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Jim Page
|
|
|
Rough in inspection complete, a follow up RTC inspection will need to be scheduled after finish ceilings are complete for cover approval.
|
Sprinkler Plan Check | 1/13/2016 | | 1/13/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/13/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/13/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/13/2016 | | 1/13/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/12/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/12/2016 | | 1/12/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/12/2016 | | 1/12/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/12/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/12/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 1/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 8 2016 10:25AM
|