Case Summary | | | 6/6/2016 | | DONE |
|
|
|
|
INSP-Final Inspection | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection for elevator passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/2/2016 | 3/3/2016 | 3/3/2016 | P | CANC |
Jim Page
|
|
|
Inspection request is for a fire alarm final, not a sprinkler rough-in/hydro, cancelling this inspection request and generating the correct request.
|
INSP-Final Inspection | 2/29/2016 | 3/2/2016 | 3/2/2016 | P | FAIL |
Troy Cobbley
|
|
|
Since the elevator contractor did not show up we could not get acces to the last heat detector to be tested in the elevator pit.
|
Plan Modification Accepted | | | 2/26/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 2/26/2016 | | DONE |
|
|
|
|
Alarm Plan Check | 2/26/2016 | | 2/26/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/26/2016 | | DONE |
|
|
|
Plan modification approved. No additional review comments.
|
Permit Ready to Issue | | | 2/26/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/26/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 2/24/2016 | | DONE |
|
|
|
DAmie emailed as built drawings. I informed him that he need to upload them as a plan modification andd all files are to have the same name as previous.
|
Plan resubmittals received | | | 2/24/2016 | | DONE |
|
|
|
Changes to original plans.
|
INSP-Final Inspection | 2/19/2016 | 2/23/2016 | 2/23/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide plan modifications and correct recall function as discussed. Need to test heat detectors as well.
|
Telephone call | | | 2/16/2016 | | DONE |
|
|
|
Damie Lasater called to say that state elevator inspector Gary Barnes is requiring a heat detector at one lobby due to it being located outside. I agreed and told Damie that the heat detector would need to be rated for the environment.
|
Plan assigned to (Lee) | 1/14/2016 | | 1/14/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/14/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 1/14/2016 | | 1/14/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/14/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 1/14/2016 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 1/14/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/14/2016 | | 1/14/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 1/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 13 2016 12:09PM
|
Miscellaneous action | | | 1/13/2016 | | DONE |
|
|
|
Emailed a list of questions to Damie regarding detector listings and information missing on drawings. Damie addressed each question and sent an updated drawing that reflected the changes.
|