Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberFIR16-00031
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2153 E RIVERWALK DR
Project NameLibrary at Bown Crossing
Customer NumberUDG
ePlanReviewYes
Description
[Library at Bown Crossing - Udg] - Quick Permit
New 6"X330 +- Underground fire sprinkler supply with necesssary fittings and thrust block to new Library building.

(LIBRARY AT BOWN CROSSING)(***GREEN BLDG PRIORITY REVIEW*** ) A NEW 16,000 SF LIBRARY FOR THE CITY OF BOISE IS COMPRISED OF THREE PARTS, INCLUDING A 5,020 SF LOBBY AND MEETING AREA, A 7,390 SF READING ROOM, AND A 3,590 SF STAFF AREA. THE LOBBY AND MEETING AREA INCLUDES THE LOBBY, PUBLIC RESTROOMS, A MEETING ROOM, MULTIPURPOSE MEETING ROOM, STUDY AREAS, AND A BOOK DROP ROOM. THE READING ROOM INCLUDES A CHILDREN'S AREA, AN ADULT LOUNGE AREA, BOOK STACKS, AND A CIRCULATION DESK. THE STAFF AREA INCLUDES OPEN OFFICE AREA, BOOK HANDLING AREA, PRIVATE OFFICE, STORAGE ROOMS, STAFF BATHROOMS, MECHANICAL AND ELECTRICAL ROOM, JANITORS CLOSETS,AND A STAFF BREAK ROOM. NOTE: This building to meet LEED V4.0, Silver – New Construction & Major Renovations certification. NOTE: This building requires building commissioning. A Preoccupancy Commissioning Report shall be submitted and accepted by the Building Official prior to issuance of the Certificate of Occupancy.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/28/20175/2/20175/2/2017APASS
DetailsJim Page
Final inspection for underground supply passed/complete
INSP-Sprinkler Rough-in/Hydro11/30/201612/1/201612/1/2016PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above hardlids and fire department connection piping complete. Notated city approved drawings with red ink area's approved for cover.
INSP-Sprinkler Rough-in/Hydro11/29/201611/30/201611/30/2016PCANC
DetailsTroy Cobbley
Mark Jensen is the contact for this inspection. He needs a rough in to cover inspection on the west system. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/16/20166/17/20166/17/2016APASS
DetailsJim Page
Rough to cover inspection complete, underground approved for cover.
INSP-Sprinkler Rough-in1/21/20161/22/20161/21/2016APART
DetailsJim Page
Rough to cover inspection for underground piping that is installed, piping that was inspected today approved for cover, contractor will schedule next inspection when they get the water supply to site and able to make the connection.
INSP-Sprinkler Rough-in/Hydro1/18/20161/19/20161/19/2016APART
DetailsJim Page
Rough to cover inspection for underground stub in to building. Area inspected only area approved for cover, contractor will schedule inspection for remaining underground when installed.
Intake Approval  1/15/2016 PASS
Plan assigned to (Tim)1/15/2016 1/15/2016 DONE
DetailsTim Frost
Sprinkler Plan Check1/15/2016 1/15/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  1/15/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  1/15/2016 DONE
DetailsTim Frost
Permit Ready to Issue  1/15/2016 DONE
Issue and Print Permit  1/15/2016 DONE
Inspection Record Card- Fire1/15/2016 1/15/2016 DONE
DetailsChristina Prado
Application received  1/14/2016 DONE
Application submitted via PDS Online on Jan 14 2016 3:32PM