INSP-Final Inspection | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PASS |
Jim Page
|
|
|
Final inspection for underground supply passed/complete.
|
INSP-Supply line flush | 6/27/2017 | 6/30/2017 | 6/30/2017 | A | DONE |
Jim Page
|
|
|
North supplied underground main line flush complete after repair made
|
INSP-Sprinkler Rough-in/Hydro | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Jim Page
|
|
|
Hydrostatic test performed after repair was made on the northeast underground supply complete.
|
INSP-Supply line flush | 6/14/2017 | 6/15/2017 | 6/15/2017 | A | DONE |
Jim Page
|
|
|
Undergournd flush for south main completed after underground repair was made.
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | PART |
Jim Page
|
|
|
Hydrostatic test for south underground supply complete.
|
INSP-Supply line flush | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | CANC |
Jim Page
|
|
|
Per Jim Page - Schedule for 06/12 Afternoon - Contact will be Ken Orahood ###-####...
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Supply line flush | 4/18/2017 | 4/19/2017 | 4/19/2017 | A | DONE |
Jim Page
|
|
|
Main supply flushes complete for both underground main feeds.
|
INSP-Supply line flush | 4/13/2017 | 4/18/2017 | 4/18/2017 | A | CANC |
Jim Page
|
|
|
Suez was not scheduled for 530 flush time, flush needs to be after hours due to traffic at valve location, flush is rescheduled for 530AM, 19APR2017.
|
INSP-Sprinkler Rough-in | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining underground complete, approved for cover.
|
INSP-Final Inspection | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | CANC |
Jim Page
|
|
|
Inspection request was for a rough to cover on remaining underground for northside supply, not a final inspection. This inspection request is cancelled and a rough in inspection will be generated.
|
INSP-Sprinkler Rough-in/Hydro | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for underground supply located on the east side of building. Underground supply installed to the northeast corner of building approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2016 | 7/20/2016 | 7/20/2016 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for underground supply main that is on the east side of building running north to south complete, area's inspected approved for cover, area that will be inspected at a later date is the remaining underground running north to south on the northeast side of building.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | CANC |
Jim Page
|
|
|
Inspection request rescheduled for 20JULY16.
|
INSP-Sprinkler Rough-in/Hydro | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for underground main supply located on southside of jobsite, partial cover is approved for underground supply running from west to east on southside of project, change of direction where main turns to go into building will be inspected at later date.
|
Permit Ready to Issue | | | 1/27/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/27/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/27/2016 | | 1/27/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/21/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/21/2016 | | 1/21/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/21/2016 | | 1/21/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/21/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/19/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 19 2016 9:51AM
|