INSP-Final Inspection | 8/16/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/16/2016 | 8/17/2016 | 8/17/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 8/11/2016 | 8/16/2016 | 8/16/2016 | P | FAIL |
Troy Cobbley
|
|
|
Need sticker on the outside alarm bell and test papers.
|
INSP-Final Inspection | 8/11/2016 | 8/12/2016 | 8/11/2016 | P | CANC |
Jim Page
|
|
|
Please call 30 minutes prior to arriving as we are not on site Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Jim Page
|
|
|
Overhead hydrostatic test passed/complete for entire project. Rough to cover inspection complete for hard-lids, hard-lids approved for cover.
|
INSP-Supply line flush | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
|
INSP-Sprinkler Rough-in/Hydro | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PASS |
Jim Page
|
|
|
Underground hydrostatic test (200psi for 2 hours) passed/complete. Remote FDC hydrostatic test (200psi for 2 hours) passed/complete
|
INSP-Sprinkler Rough-in | 2/10/2016 | 2/11/2016 | 2/11/2016 | A | PASS |
Jim Page
|
|
|
Underground remote FDC inspection passed/complete, approved for cover.
|
INSP-Sprinkler Rough-in | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for the underground fire sprinkler supply line, underground approved for cover.
|
1st review completed | | | 1/26/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/26/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 1/26/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/26/2016 | | 1/26/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Sprinkler Plan Check | 1/26/2016 | | 1/26/2016 | | PASS |
Tim Frost
|
|
|
|
Intake Approval | | | 1/22/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/22/2016 | | 1/22/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 20 2016 3:20PM
|