Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR16-00060
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 400 S BROADWAY AVE
Project NameWGP1 St. Lukes TI 5th floor
Customer Number 
ePlanReviewYes
Description
5th floor remodel replace CPVC piping with steel piping and cut in new heads to new ceilings using flex heads in grid ceilings and hard piping heads in hard lids
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/19/20165/20/20165/20/2016APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
INSP-Sprinkler Rough-in/Hydro4/4/20164/6/20164/6/2016ACANC
DetailsJim Page
Duplicate inspection request, this request cancelled per conversation with point of contact, Jon phone number ###-####.
INSP-Sprinkler Rough-in/Hydro4/4/20164/5/20164/5/2016APART
DetailsTroy Cobbley
The 5th floor hydro test passed. Also the rough-in inspection for the gridded areas passed. Piping above the gridded areas can be covered. One branch line restraint installed while I waited.
INSP-Sprinkler Rough-in/Hydro4/4/20164/4/20164/4/2016PCANC
DetailsTroy Cobbley
Rescheduled for tomorrow morning
INSP-Sprinkler Rough-in2/25/20162/26/20162/26/2016PPASS
DetailsJim Page
Rough to cover inspection complete for hard-lids on 5th floor, hard-lids approved for cover.
Intake Approval  2/1/2016 PASS
Plan assigned to (Tim)2/1/2016 2/1/2016 DONE
DetailsTim Frost
Sprinkler Plan Check2/1/2016 2/1/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  2/1/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/1/2016 DONE
DetailsTim Frost
Permit Ready to Issue  2/1/2016 DONE
Issue and Print Permit  2/1/2016 DONE
Inspection Record Card- Fire2/1/2016 2/1/2016 DONE
DetailsChristina Prado
Application received  1/28/2016 DONE
Application submitted via PDS Online on Jan 28 2016 12:57PM