Fees Due Hold | 6/22/2016 | | 8/18/2016 | | DONE |
|
|
|
sent statement on 8-1-16 for fees due
|
Print Statement | | | 8/3/2016 | | DONE |
|
|
|
|
INSP-Final Inspection | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been addressed/repaired. Final fire alarm inspection passed/complete
|
Permit Ready to Issue | | | 6/21/2016 | | DONE |
|
|
|
plan mod fees due - DO NOT re-issue
|
CHANGE STATUS TO (ISS) | | | 6/21/2016 | | DONE |
Christina Prado
|
|
|
|
Plan Modification Accepted | | | 6/21/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 6/21/2016 | | DONE |
|
|
|
Plan modification received.
|
Alarm Plan Check | 6/21/2016 | | 6/21/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/21/2016 | | DONE |
|
|
|
Plan modification approved with review comments.
|
INSP-Final Inspection | 6/14/2016 | 6/16/2016 | 6/16/2016 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the three peaked sky lights with additional protection and show the two ceiling levels that surround the sky lights, show candella changes on the second floor, provide sync for all notification devices, provide additional notification in the basement lobby, provide the sample tubes and remote annunciators for the duct smoke detectors. The only devices tested today was the first floor lobby manual pull station, four fire/smoke damperson the first floor and the south duct detector on the second floor. All other devices need to be tested. I noted that the first floor manual pull station activated elevator recall which is not allowed in current code.
|
INSP-Final Inspection | 6/14/2016 | 6/15/2016 | 6/14/2016 | A | CANC |
Jim Page
|
|
|
If you cannot reach me, please call Kenny Leslie @ ###-#### or Mike Kroll @ ###-#### Phone #: ###-#### >> Inspection requested via web by Josiah Monett Inspection cancelled from web by: Josiah Monett
|
Plan Modification Accepted | | | 6/14/2016 | | DONE |
|
|
|
Plan mod includes added duct smoke detectors, fire smoke dampers and notification in specific areas. Added notification augments existing notification.
|
Alarm Plan Check | 6/14/2016 | | 6/14/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/14/2016 | | DONE |
|
|
|
Plan mod approved with updated review comments.
|
CHANGE STATUS TO (ISS) | | | 6/14/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/14/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 6/10/2016 | | DONE |
|
|
|
Kenny requested the project be opened for a plan modification to include phase 3 work.
|
CHANGE STATUS TO (REV) | | | 6/10/2016 | | DONE |
|
|
|
Project reopened for phase 3 plan modification.
|
Alarm Plan Check | 2/8/2016 | | 2/8/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/8/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 2/8/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/8/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/8/2016 | | 2/8/2016 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 2/5/2016 | | FAIL |
|
|
|
See 1st review comments.
|
Plan assigned to (Lee) | 2/4/2016 | | 2/4/2016 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 2/4/2016 | | DONE |
|
|
|
Drawing uploaded incorrectly. I emailed Kenny and requested corrections.
|
Application received | | | 2/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 2 2016 4:04PM
|