INSP-Final Inspection | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Jim Page
|
|
|
Underground hydrostatic test complete, underground rough to cover inspection passed/complete, underground approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground stub in for building supply complete, approved for cover. 200 psi for 2 hour hydrostatic test complete for installed underground piping.
|
INSP-Sprinkler Rough-in/Hydro | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, Mike phone ###-#### , contractor no ready for hydrostatic test, inspection will be scheduled for later date.
|
Intake Approval | | | 2/16/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/16/2016 | | 2/16/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/16/2016 | | 2/16/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/16/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/16/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/16/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/16/2016 | | 2/16/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 2/12/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 12 2016 11:52AM
|