INSP-Final Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Jim Page
|
|
|
Final underground supply main inspection for stub in passed/complete.
|
INSP-Supply line flush | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | DONE |
Jim Page
|
|
|
Underground supply main line flush complete
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test complete for underground supply
|
INSP-Sprinkler Rough-in | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Jim Page
|
|
|
underground stub in inspection complete, approved for cover.
|
Intake Approval | | | 2/17/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/17/2016 | | 2/17/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/17/2016 | | 2/17/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/17/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/17/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/17/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/17/2016 | | 2/17/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 2/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2016 12:23PM
|