INSP-Final Inspection | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Jim Page
|
|
|
24 hour air test for dry system complete.
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PART |
Jim Page
|
|
|
200 psi hydrostatic test for overhead fire sprinkler piping complete. Rough in inspection for overhead fire sprinkler piping complete. 24 hour air test started at 11:00AM 28SEPT2016 with 40psi on gauge.
|
Intake Approval | | | 2/22/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/22/2016 | | 2/22/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/22/2016 | | 2/22/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/22/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/22/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/22/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/22/2016 | | 2/22/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 2/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2016 1:54PM
|