INSP-Final Inspection | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in
|
INSP-Supply line flush | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Troy Cobbley
|
|
|
Relocated underground supply is ok to cover.
|
INSP-Sprinkler Rough-in | 3/1/2016 | 3/2/2016 | 3/2/2016 | P | PASS |
Troy Cobbley
|
|
|
Remaining underground piping is ok to cover. The initial portion of the piping was installed by United Water. Shilo has provided a letter assuming responcibility
|
INSP-Sprinkler Rough-in | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PART |
Troy Cobbley
|
|
|
Piping can be covered up to the outlet provided by United Water. The remaining portion of piping has not been installed/inspected yet. Received letter from Shilo taking responcibility for underground which was partially installed by a United Water contractor.
|
Intake Approval | | | 2/19/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/19/2016 | | 2/19/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/19/2016 | | 2/19/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/19/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/19/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/19/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/19/2016 | | 2/19/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 2/18/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 18 2016 1:27PM
|