INSP-Final Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Miscellaneous action | | | 7/25/2016 | | DONE |
|
|
|
Workflow reopened for a plan mod upload.
|
Plan Modification Accepted | | | 7/25/2016 | | DONE |
|
|
|
|
Alarm Plan Check | 7/25/2016 | | 7/25/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/25/2016 | | DONE |
|
|
|
Resubmittal / as built drawings approved. No additional review comments.
|
CHANGE STATUS TO (ISS) | | | 7/25/2016 | | DONE |
|
|
|
|
INSP-Final Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is approved for 30 days with Scott's permission. For a final I need the fire alarm resubmittals approved a map and NFPA 72's.
|
INSP-Final Inspection | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | FAIL |
Troy Cobbley
|
|
|
Resubmit plans (atleast contact plan review) showing all changes which include pump room device layout changes and communication set up that does not match plans, Provide secure box for Dialer transformer, Provide correct labels for the dedicated circuits for the FACP and Bell, Switch addresses for points 42 and 43, Repair strob in Breakroom, Verify Protecto wire temp, Verify compliance with approval notes 1 through 10 (It appears note #1 is not being met). Need to verify signals with written report as discussed. See the city approved plans for devices tested marked "ok"
|
Permit Ready to Issue | | | 3/14/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/14/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/14/2016 | | 3/14/2016 | | DONE |
Christina Prado
|
|
|
|
Alarm Plan Check | 3/11/2016 | | 3/11/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/11/2016 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Plan resubmittals received | | | 3/7/2016 | | DONE |
|
|
|
|
1st review completed | | | 3/2/2016 | | FAIL |
|
|
|
See 1st review comments 3-3-2016
|
Plan assigned to (Lee) | 3/1/2016 | | 3/1/2016 | | DONE |
Lee G Meredith
|
|
|
|
Application received | | | 2/25/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 25 2016 11:50AM
|
Miscellaneous action | | | 2/25/2016 | | DONE |
|
|
|
Emailed Dante to let him know sprinkler plans have not been received yet so review may be delayed until then. If reviewed prior to that, any issued permit would be subject to sprinkler permit requirements.
|